Storage First Hervey Bay

The last stage of the Storage First facility in Hervey Bay QLD is now finished.  This stage is the second half of “Building 3” which is actually the fifth building on the site.

A two storey construction about 1850m2 GFA, with fit-out to ground and first floors comprising 135 units.  A new fire rated door and frame was installed into the separating wall for ease of access between the 2 stages.
A cantilever type awning to cover the hoist area for all weather use of the goods hoist.

The first floor fit-out incorporates full height partitions and corridor to underside of the roof purlins. Providing a high level of anti-intrusion between units as well as keeping dust etc. out of storage areas.