Kennards Self Storage – Seaford SA.

Working with Buildtec Group as head contractor, Bridgmond Projects completed this project in March 2017.  Comprising of three buildings, Stage 1 has a little over 5000m2 of floor area with 345 rent-able units of different sizes.  In this project there are several of the larger units (coined as Enterprise units by KSS) with extra high bays and direct access from the driveway.  In all three buildings, access to the various size units on the first floor is via dedicated goods hoists.

Bridgmond Projects task was the conversion of two existing buildings and the construction from the ground up of a third multi-storey building.  The two existing buildings received transformation by way of installing insulation to the roof as well as patching and installing more effective ventilation.  The external walls were given a makeover with new cladding, new attached awnings and installation of external roller doors.  All in accord with the KSS specification to match the new building nicely.  Then a mezzanine floor, specifically engineered for existing conditions was installed before finally the self storage fit-out of ground and first floors.

The third building was again specifically engineered to suit the site conditions and to allow for maximum number of ground floor units to be accessible from the driveways.  Sealing up the buildings with custom flashings and splashes of Kennards Self Storage colours and there you go – ready for business.

We always enjoy doing these projects for Kennards Self Storage and it was a pleasure working with Buildtec Group on this one too.

Related Projects
Contact Us today